Archive

Archive for March 14, 2017

The Blue Pullman : How to design a train, the Bill Mitchell way…

March 14, 2017 Leave a comment

A quick post to capture some thoughts on a fascinating conversation I had with my friends Bill & Joy Mitchell a week or so ago, and the barely believable story that Bill helped designed a train, and not just any old train. The famous Blue Pullman luxury train that set speed records between London & Manchester throughout the mid 1960’s and 70’s.

It all started apparently when Bill was approached by George Williams who at the time was the chief designer for British Rail. He asked if Bill would be interested in developing some full size mock ups for a 125mph train and a 250mph version. Bill decided that he was and after a fact finding trip up to Derby (the main fact uncovered being that there were hardly any drawings available to work from) set about finding a space big enough to make the mockups.

The answer was found in three sheds on the Woolwich Road where Bill and his team set about forming GRP into an engine unit and a carriage. He told me that the finished versions were in polished silver GRP and not blue, and that they looked very futuristic, shining like stainless steel bullets…

To get these huge things out of the studio once finished required the removal of an end wall to get them onto a lorry to take down to Marylebone Station, and it was at this point that Bill remembered someone had rung up the local police to tell them they’d been a train crash on the Woolwich Road, a story that apparently made the local papers..

As well as the overall shape of the train, including the instantly recognisable twin windowed front nose, Bill told me he designed the round cornered windows (versions of which are still used to this day), the little table lights, the adjustable seats (“borrowed” from a Russian train) the galley kitchen, the overhead parcel racks (“borrowed” from a VC10) a non touch lavatory flush system and all the door ironmongery. He also designed the individual inlaid timber panels at the end of each carriage, one of which can just about be seen on the above video at about 13 seconds, and another at the top of the image below…

When I asked how as an artist, he had managed to interpret and ensure compliance with all the design briefs, H&S standards and rules that I assumed must surely play a part in designing something as serious and potentially lethal as a diesel-electric train, Bill just said “No, we didn’t bother with any of that business, they just wanted something that looked good and wanted it quickly…”

If only it were that simple today…

 